PROJECTS PORTFOLIO

Recent Work

original.jpg

UCONN ATHLETIC DISTRICT

Redevelopment of the existing athletic facilities for soccer, baseball, softball and track/field throwing at the southwest portion of the Storrs campus.


Project Features


  • New 75,000 gsf Performance Center

  • 4,000 seat turf soccer stadium

  • 1,300 seat turf baseball stadium

  • 500 seat turf softball stadium

  • New throw facility (discus, hammer, shot put, and javelin)

  • Infrastructure improvements included re-routing and replacing utilities

  • Streetscape improvements

  • Site restoration and landscaping

UCONN INNOVATIVE PARTNERSHIP BUILDING

The Innovation Partnership Building (IPB) is an 113,700 GSF research building that will house state-of-the-art specialized equipment and instrumentation for nanofabrication, precision manufacturing, biomedical devices/sensor development, advanced modeling/simulation and material characterization. It is the first building to be constructed in the University of Connecticut’s Technology Park accessed via Discovery Drive.

UIP 04272016 (4).JPG
Resized_Screenshot_20211102-152433_Gallery_edited.jpg

ROUTE 140 OVER CHARTERS BROOK

This three sided box culvert was a very complex project. Utilizing sheet piling we retained the earth and water to excavate 20' deep and install the precast footings, wingwalls and culvert pieces. One of the first bridge projects in CT to utilize ultra high performance concrete (UHPC). Running into 40 unforeseen timber piles and a much larger existing foundation than expected caused for some delays, but we took it in stride and were able to complete the project without substantial delays.