UConn South Campus Infrastructure, Phase 1
Gerber Construction rerouted and rebuilt the utility backbone under the University of Connecticut's South Campus in Storrs, ahead of new residence halls and a dining hall.
University of Connecticut · Storrs, CT · 2023–2024 · Steam line relocation, storm/sanitary/water utilities, pump station work, Gilbert Road and Mansfield Road reconstruction, phasing and traffic control

Under UConn's South Campus runs the utility backbone for the residence halls and dining hall that were about to be built. Gerber rerouted and rebuilt it ahead of the new construction.
Steam, storm, sanitary and water lines, pump station work, and the Gilbert Road and Mansfield Road intersection, all on an open campus and around the academic calendar, from 2023 into 2024. Phasing, traffic control and keeping buildings in service were as much the job as the pipe.
Gerber's scope
- Steam line relocation
- Storm, sanitary and water utilities
- Pump station work
- Roadway and intersection reconstruction
- Campus phasing and maintenance of traffic