Gerber Construction was CTDOT's prime contractor for the replacement of Bridge No. 02668, which carries Route 140 over Charters Brook in Ellington, Connecticut. We built it with the road live and the brook flowing.
CTDOT · Ellington, CT · 2020–2021 · Prime contractor: cofferdam and water handling, excavation and sheeting, precast structure placement, roadway reconstruction; cast-in-place concrete and paving carried in our contract

Bridge No. 02668 carries Route 140 over Charters Brook in Ellington, a few minutes from our shop. For CTDOT, Gerber replaced the structure as prime contractor.
We installed a cofferdam and handled the brook through the work, made the mass cut, set the sheeting and placed the new precast structure. As prime we also carried the cast-in-place concrete and the roadway rebuild and paving over the top. State bridge work on a live road, with the water running the whole time.
Gerber's scope
- Cofferdam and water handling
- Mass excavation and sheeting
- Precast structure
- Cast-in-place concrete
- Roadway reconstruction and paving